Triple

T21591228
Position Surface form Disambiguated ID Type / Status
Subject Chaharshanbe Suri E532783 entity
Predicate instanceOf P0 FINISHED
Object pre-Nowruz celebration C4029 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: pre-Nowruz celebration
Context triple: [Chaharshanbe Suri, instanceOf, pre-Nowruz celebration]
  • A. pre-Lenten festival
    A pre-Lenten festival is a celebratory period of feasting, parades, and revelry that occurs before the Christian season of Lent, often marked by costumes, music, and communal gatherings.
  • B. New Year celebration chosen
    A New Year celebration is a festive event marking the transition from one year to the next, typically involving gatherings, countdowns, fireworks, and cultural or personal rituals of reflection and renewal.
  • C. holiday celebration
    A holiday celebration is a festive event or series of activities held to honor a culturally, religiously, or historically significant day, often involving traditions, gatherings, and special rituals.
  • D. period of preparation
    A period of preparation is a span of time intentionally set aside to gather resources, build skills, and organize plans in advance of a forthcoming event or undertaking.
  • E. Gurpurab
    Gurpurab is a Sikh religious festival that commemorates the birth or death anniversary of a Sikh Guru, marked by prayers, processions, and community service.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c46251648190876f0427cf2d321b completed April 16, 2026, 11:13 a.m.
Created at: April 16, 2026, 6:32 p.m.