Triple

T21577953
Position Surface form Disambiguated ID Type / Status
Subject Transportation in Middlesex County, Massachusetts E532448 entity
Predicate containsFacility P12416 FINISHED
Object Route 3 expressway NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Route 3 expressway | Statement: [Transportation in Middlesex County, Massachusetts, containsFacility, Route 3 expressway]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Route 3 expressway
Context triple: [Transportation in Middlesex County, Massachusetts, containsFacility, Route 3 expressway]
  • A. Hunter Expressway
    Hunter Expressway is a major freeway in New South Wales, Australia, that provides a high-speed link between Newcastle and the Hunter Valley region.
  • B. West Shore Expressway
    The West Shore Expressway is a major limited-access highway on Staten Island in New York City that runs along the island’s western shore, connecting the Outerbridge Crossing to the Staten Island Expressway.
  • C. Nassau Expressway
    Nassau Expressway is a major roadway in the New York metropolitan area that links parts of Long Island to John F. Kennedy International Airport and other key regional highways.
  • D. Kingery Expressway
    Kingery Expressway is a major freeway in northeastern Illinois that serves as a key connector for regional and interstate traffic in the Chicago metropolitan area.
  • E. Bonaventure Expressway
    The Bonaventure Expressway is a major urban highway in Montreal that serves as a key gateway connecting downtown to the Champlain Bridge and regional road network.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Route 3 expressway
Target entity description: Route 3 expressway is a major limited-access highway in eastern Massachusetts that connects the Boston metropolitan area with communities to the south, including the South Shore and Cape Cod region.
  • A. Hunter Expressway
    Hunter Expressway is a major freeway in New South Wales, Australia, that provides a high-speed link between Newcastle and the Hunter Valley region.
  • B. West Shore Expressway
    The West Shore Expressway is a major limited-access highway on Staten Island in New York City that runs along the island’s western shore, connecting the Outerbridge Crossing to the Staten Island Expressway.
  • C. Nassau Expressway
    Nassau Expressway is a major roadway in the New York metropolitan area that links parts of Long Island to John F. Kennedy International Airport and other key regional highways.
  • D. Kingery Expressway
    Kingery Expressway is a major freeway in northeastern Illinois that serves as a key connector for regional and interstate traffic in the Chicago metropolitan area.
  • E. Bonaventure Expressway
    The Bonaventure Expressway is a major urban highway in Montreal that serves as a key gateway connecting downtown to the Champlain Bridge and regional road network.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c4618bec8190bcb0feb74568cbb1 completed April 16, 2026, 11:13 a.m.
NER Named-entity recognition batch_69eeeb59cee08190aae55ad6e2a4e077 completed April 27, 2026, 4:51 a.m.
Created at: April 16, 2026, 6:31 p.m.