Triple
T21572914
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | International Space Station flight control teams |
E532327
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | ground control team |
C6199
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: ground control team Context triple: [International Space Station flight control teams, instanceOf, ground control team]
-
A.
ground tracking facility
A ground tracking facility is a terrestrial station equipped with antennas, sensors, and communication systems used to monitor, communicate with, and control spacecraft or other remote vehicles.
-
B.
ground combat controller
A ground combat controller is a specialized military operator who coordinates and directs air and artillery support, surveillance assets, and ground maneuver elements to achieve tactical objectives on the battlefield.
-
C.
NASA ground support equipment
NASA ground support equipment comprises the specialized tools, structures, and systems used on the ground to assemble, test, transport, service, and launch spacecraft and launch vehicles safely and reliably.
-
D.
Vanguard
Vanguard: A frontline protector who leads the charge, absorbing damage and controlling the battlefield to shield allies and disrupt enemies.
-
E.
ground segment equipment
chosen
Ground segment equipment comprises the terrestrial hardware and software systems that support, control, communicate with, and process data from space-based assets such as satellites.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0c4618bec8190bcb0feb74568cbb1 |
completed | April 16, 2026, 11:13 a.m. |
Created at: April 16, 2026, 6:30 p.m.