Triple

T21572868
Position Surface form Disambiguated ID Type / Status
Subject POIC E532326 entity
Predicate instanceOf P0 FINISHED
Object Mission control center C34654 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Mission control center
Context triple: [POIC, instanceOf, Mission control center]
  • A. space operations center chosen
    A space operations center is a specialized facility that monitors, controls, and coordinates spacecraft, satellites, and related space missions in real time.
  • B. NASA center
    A NASA center is a major facility or campus operated by the National Aeronautics and Space Administration that conducts research, development, testing, and mission operations in specific areas of aerospace and space exploration.
  • C. command and control centre
    A command and control centre is a centralized facility where information is collected, analyzed, and used to coordinate and direct operations, resources, and decision-making in real time.
  • D. space operations command
    A space operations command is a military or governmental organizational unit responsible for planning, directing, and controlling space-based assets and activities to support national security, communications, navigation, and situational awareness.
  • E. space center building
    A space center building is a specialized facility that houses mission control, research laboratories, spacecraft assembly areas, and support infrastructure for planning, monitoring, and managing space missions.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c4618bec8190bcb0feb74568cbb1 completed April 16, 2026, 11:13 a.m.
Created at: April 16, 2026, 6:30 p.m.