Triple

T21568824
Position Surface form Disambiguated ID Type / Status
Subject British Rail Provincial sector E532230 entity
Predicate didNotOperate P2509 FINISHED
Object InterCity services LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: InterCity services | Statement: [British Rail Provincial sector, didNotOperate, InterCity services]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: didNotOperate
Context triple: [British Rail Provincial sector, didNotOperate, InterCity services]
  • A. operatedWithout
    Indicates that an action, process, or entity functioned or was carried out in the absence of a specified resource, condition, or participant.
  • B. doesNotOperate chosen
    Indicates that an entity is not functioning, active, or performing its intended operation in relation to another entity or context.
  • C. didNotHold
    Indicates that an expected event, condition, or relationship failed to occur or be valid.
  • D. didNotOverrule
    Indicates that one entity, typically a higher authority or court, chose not to overturn, reverse, or invalidate the decision or ruling made by another entity.
  • E. didNotBecome
    Indicates that an expected or potential change of state, role, or condition between entities did not occur.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c460db088190828c64206a450273 completed April 16, 2026, 11:13 a.m.
NER Named-entity recognition batch_69eee9cad95c8190ab165ced6f242302 completed April 27, 2026, 4:44 a.m.
PD Predicate disambiguation batch_69e6320c8c2c81908bf031447d66a052 completed April 20, 2026, 2:02 p.m.
Created at: April 16, 2026, 6:30 p.m.