Triple

T21566656
Position Surface form Disambiguated ID Type / Status
Subject MetroBus E532178 entity
Predicate instanceOf P0 FINISHED
Object public transportation system component C2489 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: public transportation system component
Context triple: [MetroBus, instanceOf, public transportation system component]
  • A. public transit system
    A public transit system is an organized network of shared transportation services—such as buses, trains, subways, and trams—designed to move large numbers of people efficiently within and between urban and regional areas.
  • B. public transportation infrastructure chosen
    Public transportation infrastructure encompasses the physical and organizational systems—such as buses, trains, stations, tracks, and supporting facilities—that enable the efficient movement of people via shared transit services.
  • C. streetcar system
    A streetcar system is an urban public transit network that operates rail vehicles on fixed tracks, typically embedded in city streets, to transport passengers along defined routes.
  • D. continuous transport system
    A continuous transport system is a material handling arrangement that moves goods or resources in an uninterrupted flow along a fixed path using devices such as conveyors, pipelines, or automated tracks.
  • E. rubber-tired transit system
    A rubber-tired transit system is a guided public transportation mode in which vehicles run on rubber tires along a dedicated roadway or track, often combining bus-like flexibility with rail-like guidance and capacity.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c460db088190828c64206a450273 completed April 16, 2026, 11:13 a.m.
Created at: April 16, 2026, 6:30 p.m.