Triple
T21562484
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Blindern campus |
E532071
|
entity |
| Predicate | hasPart |
P35
|
FINISHED |
| Object | ZEB Building (Zero Emission Building, UiO) |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: ZEB Building (Zero Emission Building, UiO) | Statement: [Blindern campus, hasPart, ZEB Building (Zero Emission Building, UiO)]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: ZEB Building (Zero Emission Building, UiO) Context triple: [Blindern campus, hasPart, ZEB Building (Zero Emission Building, UiO)]
-
A.
Utzon Center, Aalborg
The Utzon Center in Aalborg is a cultural and architectural complex on the waterfront, designed by architect Jan Utzon as a hub for exhibitions, education, and research in architecture and design.
-
B.
Mjøstårnet
Mjøstårnet is a pioneering high-rise timber building in Norway recognized as one of the tallest wooden structures in the world.
-
C.
Elkem Building in Oslo
The Elkem Building in Oslo is a modernist office building renowned for its innovative use of concrete and integrated art, designed by Norwegian architect Erling Viksjø.
-
D.
Windcatcher Building
The Windcatcher Building is a historic structure within Tehran’s Golestan Palace complex, notable for its traditional Persian wind tower designed to provide natural ventilation and cooling.
-
E.
Snøhetta Dome
Snøhetta Dome is a prominent ice-covered summit in Antarctica’s Mühlig-Hofmann Mountains, known as a notable geographic feature of Queen Maud Land.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: ZEB Building (Zero Emission Building, UiO) Target entity description: ZEB Building (Zero Emission Building, UiO) is a research and demonstration facility at the University of Oslo dedicated to developing and showcasing zero-emission building technologies and sustainable architecture.
-
A.
Utzon Center, Aalborg
The Utzon Center in Aalborg is a cultural and architectural complex on the waterfront, designed by architect Jan Utzon as a hub for exhibitions, education, and research in architecture and design.
-
B.
Mjøstårnet
Mjøstårnet is a pioneering high-rise timber building in Norway recognized as one of the tallest wooden structures in the world.
-
C.
Elkem Building in Oslo
The Elkem Building in Oslo is a modernist office building renowned for its innovative use of concrete and integrated art, designed by Norwegian architect Erling Viksjø.
-
D.
Windcatcher Building
The Windcatcher Building is a historic structure within Tehran’s Golestan Palace complex, notable for its traditional Persian wind tower designed to provide natural ventilation and cooling.
-
E.
Snøhetta Dome
Snøhetta Dome is a prominent ice-covered summit in Antarctica’s Mühlig-Hofmann Mountains, known as a notable geographic feature of Queen Maud Land.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0c460db088190828c64206a450273 |
completed | April 16, 2026, 11:13 a.m. |
| NER | Named-entity recognition | batch_69eed2e5c3348190b67003e7027efa60 |
completed | April 27, 2026, 3:07 a.m. |
Created at: April 16, 2026, 6:29 p.m.