Triple

T21559820
Position Surface form Disambiguated ID Type / Status
Subject Round Island restoration (Mauritius) E531985 entity
Predicate instanceOf P0 FINISHED
Object ecological restoration programme C2060 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: ecological restoration programme
Context triple: [Round Island restoration (Mauritius), instanceOf, ecological restoration programme]
  • A. ecological restoration site
    An ecological restoration site is a designated area where degraded or altered ecosystems are actively managed and rehabilitated to recover their natural structure, function, and biodiversity.
  • B. environmental programme chosen
    An environmental programme is an organized set of coordinated activities, policies, and initiatives designed to protect, manage, or improve the natural environment and promote sustainable practices.
  • C. restored wetland
    A restored wetland is a previously degraded or altered wetland area that has been intentionally rehabilitated to recover its natural hydrology, vegetation, and ecological functions.
  • D. biodiversity conservation initiative
    A biodiversity conservation initiative is a coordinated effort or program designed to protect, restore, and sustainably manage the variety of life in ecosystems, species, and genetic resources within a defined area or context.
  • E. ecosystem management plan
    An ecosystem management plan is a strategic, science-based framework that outlines goals, actions, and monitoring methods to maintain or restore the health, resilience, and sustainability of a specific ecosystem while balancing ecological, social, and economic needs.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c460232c81908de2c3819d17c00e completed April 16, 2026, 11:13 a.m.
Created at: April 16, 2026, 6:29 p.m.