Triple
T21549913
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Barton Creek |
E531732
|
entity |
| Predicate | recreationArea |
P5383
|
FINISHED |
| Object | Upper Barton Creek Greenbelt |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Upper Barton Creek Greenbelt | Statement: [Barton Creek, recreationArea, Upper Barton Creek Greenbelt]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Upper Barton Creek Greenbelt Context triple: [Barton Creek, recreationArea, Upper Barton Creek Greenbelt]
-
A.
Ellicott Creek Park
Ellicott Creek Park is a public recreational park in Erie County, New York, offering green space, trails, and waterfront access along Ellicott Creek.
-
B.
Elm Fork Greenbelt
Elm Fork Greenbelt is a natural corridor and recreational area along the Elm Fork of the Trinity River that provides trails, wildlife habitat, and open space within the Dallas park system.
-
C.
Nine Mile Run greenway
Nine Mile Run greenway is an urban green corridor and restored natural area in Pittsburgh that provides trails, recreation space, and ecological habitat along the Nine Mile Run stream.
-
D.
Six Mile Creek Natural Area
Six Mile Creek Natural Area is a protected outdoor recreation and conservation area along Six Mile Creek, offering trails and natural scenery for activities like hiking and wildlife observation.
-
E.
Southwest Corridor Park
Southwest Corridor Park is a linear urban greenway in Boston that combines parks, playgrounds, and bike paths along a former rail corridor connecting several neighborhoods.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Upper Barton Creek Greenbelt Target entity description: Upper Barton Creek Greenbelt is a popular natural greenbelt in Austin, Texas, known for its hiking trails, scenic creek views, and outdoor recreation opportunities.
-
A.
Ellicott Creek Park
Ellicott Creek Park is a public recreational park in Erie County, New York, offering green space, trails, and waterfront access along Ellicott Creek.
-
B.
Elm Fork Greenbelt
Elm Fork Greenbelt is a natural corridor and recreational area along the Elm Fork of the Trinity River that provides trails, wildlife habitat, and open space within the Dallas park system.
-
C.
Nine Mile Run greenway
Nine Mile Run greenway is an urban green corridor and restored natural area in Pittsburgh that provides trails, recreation space, and ecological habitat along the Nine Mile Run stream.
-
D.
Six Mile Creek Natural Area
Six Mile Creek Natural Area is a protected outdoor recreation and conservation area along Six Mile Creek, offering trails and natural scenery for activities like hiking and wildlife observation.
-
E.
Southwest Corridor Park
Southwest Corridor Park is a linear urban greenway in Boston that combines parks, playgrounds, and bike paths along a former rail corridor connecting several neighborhoods.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0c460232c81908de2c3819d17c00e |
completed | April 16, 2026, 11:13 a.m. |
| NER | Named-entity recognition | batch_69eeb5917fb88190a8d37831cced75dc |
completed | April 27, 2026, 1:02 a.m. |
Created at: April 16, 2026, 6:28 p.m.