Triple

T21548073
Position Surface form Disambiguated ID Type / Status
Subject Susitna-Watana Hydroelectric Project E531681 entity
Predicate planningSuspended P106660 FINISHED
Object mid-2010s LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: mid-2010s | Statement: [Susitna-Watana Hydroelectric Project, planningSuspended, mid-2010s]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: planningSuspended
Context triple: [Susitna-Watana Hydroelectric Project, planningSuspended, mid-2010s]
  • A. suspendedIn
    Indicates that one entity is held or maintained within another medium or environment without settling or separating.
  • B. suspendedAfter chosen
    Indicates that one entity is suspended or put on hold after the occurrence or completion of another entity or event.
  • C. isSuspended
    Indicates that an entity is temporarily removed from its normal role, function, or privileges, typically as a result of a rule, policy, or disciplinary action.
  • D. maySuspend
    Indicates that one entity has the authority or permission to temporarily suspend another entity or its associated activity, status, or operation.
  • E. workSuspensionRequired
    Indicates that a temporary halt or suspension of work activities is mandated under certain conditions.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c45f17148190949c330ab9c27706 completed April 16, 2026, 11:13 a.m.
NER Named-entity recognition batch_69eeb590bb0881908cd849096696db10 completed April 27, 2026, 1:02 a.m.
PD Predicate disambiguation batch_69e6320766308190ba5dca2f7c826aa4 completed April 20, 2026, 2:02 p.m.
Created at: April 16, 2026, 6:28 p.m.