Triple

T21547031
Position Surface form Disambiguated ID Type / Status
Subject Independence Power & Light E531650 entity
Predicate hasPowerPlant P9904 FINISHED
Object Missouri City power plant NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Missouri City power plant | Statement: [Independence Power & Light, hasPowerPlant, Missouri City power plant]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Missouri City power plant
Context triple: [Independence Power & Light, hasPowerPlant, Missouri City power plant]
  • A. Kemper Project power plant
    The Kemper Project power plant is a controversial, partially abandoned integrated gasification combined cycle (IGCC) power facility in Mississippi that became known for massive cost overruns and the failure of its “clean coal” technology ambitions.
  • B. LaSalle County Generating Station
    LaSalle County Generating Station is a nuclear power plant in northern Illinois that generates electricity for the regional grid.
  • C. Kirkwood Powerhouse
    Kirkwood Powerhouse is a hydroelectric generating facility within San Francisco’s Hetch Hetchy Power System that converts water from the Hetch Hetchy project into electricity.
  • D. Beaumont Generating Station
    Beaumont Generating Station is a hydroelectric power plant located on the Saint-Maurice River in Quebec, Canada, contributing to the region’s renewable electricity generation.
  • E. Rosa Power Plant
    Rosa Power Plant is a major coal-based thermal power station in Uttar Pradesh, India, developed and operated by Reliance Power to supply electricity to the northern grid.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Missouri City power plant
Target entity description: Missouri City power plant is a generating facility that supplies electric power for the municipal utility Independence Power & Light in Missouri.
  • A. Kemper Project power plant
    The Kemper Project power plant is a controversial, partially abandoned integrated gasification combined cycle (IGCC) power facility in Mississippi that became known for massive cost overruns and the failure of its “clean coal” technology ambitions.
  • B. LaSalle County Generating Station
    LaSalle County Generating Station is a nuclear power plant in northern Illinois that generates electricity for the regional grid.
  • C. Kirkwood Powerhouse
    Kirkwood Powerhouse is a hydroelectric generating facility within San Francisco’s Hetch Hetchy Power System that converts water from the Hetch Hetchy project into electricity.
  • D. Beaumont Generating Station
    Beaumont Generating Station is a hydroelectric power plant located on the Saint-Maurice River in Quebec, Canada, contributing to the region’s renewable electricity generation.
  • E. Rosa Power Plant
    Rosa Power Plant is a major coal-based thermal power station in Uttar Pradesh, India, developed and operated by Reliance Power to supply electricity to the northern grid.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c45f17148190949c330ab9c27706 completed April 16, 2026, 11:13 a.m.
NER Named-entity recognition batch_69eeb58fb6608190a58cd00ecf560834 completed April 27, 2026, 1:02 a.m.
Created at: April 16, 2026, 6:28 p.m.