Triple
T21546500
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Pichi Picún Leufú Dam |
E531636
|
entity |
| Predicate | locatedUpstreamOf |
P5955
|
FINISHED |
| Object | El Chocón Dam |
—
|
NE NERFINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: El Chocón Dam | Statement: [Pichi Picún Leufú Dam, locatedUpstreamOf, El Chocón Dam]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: El Chocón Dam Context triple: [Pichi Picún Leufú Dam, locatedUpstreamOf, El Chocón Dam]
-
A.
El Chocón Dam
chosen
El Chocón Dam is a large hydroelectric dam in Argentina known for its significant role in power generation and flood control on the Limay River.
-
B.
Chicoasén Dam
Chicoasén Dam is a major hydroelectric dam in Chiapas, Mexico, known as one of the largest power-generating facilities in the country.
-
C.
San Carlos Dam
San Carlos Dam is a major concrete gravity dam in Arizona that creates San Carlos Lake and provides irrigation water, flood control, and hydroelectric power along the Gila River.
-
D.
Angostura Dam
Angostura Dam is a hydroelectric power facility located on Chile’s Biobío River, contributing to the country’s renewable energy generation.
-
E.
Angostura Dam
Angostura Dam is a major hydroelectric dam in Mexico that forms part of the country’s important Grijalva River power generation system.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0c45f17148190949c330ab9c27706 |
completed | April 16, 2026, 11:13 a.m. |
| NER | Named-entity recognition | batch_69eeb58ef2548190a81ff51baba76e48 |
completed | April 27, 2026, 1:02 a.m. |
Created at: April 16, 2026, 6:28 p.m.