Triple
T21546494
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Pichi Picún Leufú Dam |
E531636
|
entity |
| Predicate | partOf |
P40
|
FINISHED |
| Object | Argentine National Interconnected System |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Argentine National Interconnected System | Statement: [Pichi Picún Leufú Dam, partOf, Argentine National Interconnected System]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Argentine National Interconnected System Context triple: [Pichi Picún Leufú Dam, partOf, Argentine National Interconnected System]
-
A.
South American power grid
The South American power grid is the interconnected network of electricity generation, transmission, and distribution systems across South American countries, integrating major resources such as large hydroelectric complexes to supply power regionally.
-
B.
Colombian National Interconnected System
The Colombian National Interconnected System is the nationwide electricity grid that integrates Colombia’s power generation, transmission, and distribution infrastructure into a unified network.
-
C.
Brazilian National Interconnected System
The Brazilian National Interconnected System is the nationwide electricity grid that links most of Brazil’s power plants and regions into a single, integrated power network.
-
D.
Chilean national power system
The Chilean national power system is the interconnected electricity grid that generates, transmits, and distributes most of Chile’s electrical energy across the country.
-
E.
Argentine railway system
The Argentine railway system is the national network of passenger and freight rail lines that connects major cities and regions across Argentina and has historically played a central role in the country’s economic and territorial development.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Argentine National Interconnected System Target entity description: The Argentine National Interconnected System is the nationwide high-voltage electricity transmission network that links most of Argentina’s power plants with its regional distribution grids.
-
A.
South American power grid
The South American power grid is the interconnected network of electricity generation, transmission, and distribution systems across South American countries, integrating major resources such as large hydroelectric complexes to supply power regionally.
-
B.
Colombian National Interconnected System
The Colombian National Interconnected System is the nationwide electricity grid that integrates Colombia’s power generation, transmission, and distribution infrastructure into a unified network.
-
C.
Brazilian National Interconnected System
The Brazilian National Interconnected System is the nationwide electricity grid that links most of Brazil’s power plants and regions into a single, integrated power network.
-
D.
Chilean national power system
The Chilean national power system is the interconnected electricity grid that generates, transmits, and distributes most of Chile’s electrical energy across the country.
-
E.
Argentine railway system
The Argentine railway system is the national network of passenger and freight rail lines that connects major cities and regions across Argentina and has historically played a central role in the country’s economic and territorial development.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0c45f17148190949c330ab9c27706 |
completed | April 16, 2026, 11:13 a.m. |
| NER | Named-entity recognition | batch_69eeb58ef2548190a81ff51baba76e48 |
completed | April 27, 2026, 1:02 a.m. |
Created at: April 16, 2026, 6:28 p.m.