Triple
T21542175
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Athens Perimeter |
E531518
|
entity |
| Predicate | partOf |
P40
|
FINISHED |
| Object | Georgia State Route 422 |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Georgia State Route 422 | Statement: [Athens Perimeter, partOf, Georgia State Route 422]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Georgia State Route 422 Context triple: [Athens Perimeter, partOf, Georgia State Route 422]
-
A.
Georgia State Route 42
Georgia State Route 42 is a state highway in central Georgia that runs generally north–south, connecting communities such as Forsyth with the Atlanta metropolitan area and other regional destinations.
-
B.
Georgia State Route 242
Georgia State Route 242 is a short state highway in central Georgia that provides a local connector route in and around Sandersville.
-
C.
Georgia State Route 224
Georgia State Route 224 is a state highway in central Georgia that serves as a regional connector route in and around the city of Perry.
-
D.
Georgia State Route 223
Georgia State Route 223 is a state highway in east-central Georgia that serves as a regional connector route, including access to and from the Grovetown area.
-
E.
Georgia State Route 22
Georgia State Route 22 is a primary east–west state highway in Georgia that connects several central and western communities, including the city of Columbus, across multiple counties.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Georgia State Route 422 Target entity description: Georgia State Route 422 is a state highway designation in Georgia that primarily corresponds to the Athens Perimeter, a loop route encircling the city of Athens.
-
A.
Georgia State Route 42
Georgia State Route 42 is a state highway in central Georgia that runs generally north–south, connecting communities such as Forsyth with the Atlanta metropolitan area and other regional destinations.
-
B.
Georgia State Route 242
Georgia State Route 242 is a short state highway in central Georgia that provides a local connector route in and around Sandersville.
-
C.
Georgia State Route 224
Georgia State Route 224 is a state highway in central Georgia that serves as a regional connector route in and around the city of Perry.
-
D.
Georgia State Route 223
Georgia State Route 223 is a state highway in east-central Georgia that serves as a regional connector route, including access to and from the Grovetown area.
-
E.
Georgia State Route 22
Georgia State Route 22 is a primary east–west state highway in Georgia that connects several central and western communities, including the city of Columbus, across multiple counties.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0c45f17148190949c330ab9c27706 |
completed | April 16, 2026, 11:13 a.m. |
| NER | Named-entity recognition | batch_69eeb58c34808190b0eb54ba01e2cc13 |
completed | April 27, 2026, 1:02 a.m. |
Created at: April 16, 2026, 6:28 p.m.