Triple

T2153952
Position Surface form Disambiguated ID Type / Status
Subject Bab al-Kaaba E47843 entity
Predicate instanceOf P0 FINISHED
Object door C6652 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: door
Context triple: [Bab al-Kaaba, instanceOf, door]
  • A. entrance chosen
    An entrance is a designated point of access that allows people or objects to move from the outside into a defined space or area.
  • B. room
    A room is an enclosed, distinct interior space within a building designed for specific activities or purposes, such as living, sleeping, working, or storage.
  • C. floor of a building
    A floor of a building is a horizontal structural level designed to support occupants and activities, typically bounded vertically by ceilings and/or other floors.
  • D. elevator
    An elevator is a vertically moving transport device within a building that carries people or goods between different floors using a guided platform and mechanical lifting system.
  • E. witch
    A witch is a person, often depicted as possessing innate or learned magical abilities, who practices spells, rituals, and other forms of sorcery that can influence people, events, or the natural world.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a88a1d1fd8819088b34990d69a712f completed March 4, 2026, 7:38 p.m.
Created at: March 4, 2026, 7:44 p.m.