Triple

T21525469
Position Surface form Disambiguated ID Type / Status
Subject Rimrock Overlook E531083 entity
Predicate near P350 FINISHED
Object Kinzua Dam NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Kinzua Dam | Statement: [Rimrock Overlook, near, Kinzua Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Kinzua Dam
Context triple: [Rimrock Overlook, near, Kinzua Dam]
  • A. Kinzua Dam chosen
    Kinzua Dam is a large U.S. Army Corps of Engineers flood-control and hydroelectric dam in northwestern Pennsylvania that created the Allegheny Reservoir.
  • B. Matatila Dam
    Matatila Dam is a multipurpose masonry dam on the Betwa River in Uttar Pradesh, India, primarily used for irrigation and hydroelectric power generation.
  • C. Itezhi-Tezhi Dam
    Itezhi-Tezhi Dam is a major hydroelectric and water-regulation dam in Zambia that helps control flows and generate power along the Kafue River system, a key tributary of the Zambezi.
  • D. Kariba Dam
    Kariba Dam is a massive hydroelectric dam on the Zambezi River between Zambia and Zimbabwe, forming one of the world’s largest man-made lakes and serving as a key source of power for the region.
  • E. Tantangara Dam
    Tantangara Dam is a major concrete gravity dam in New South Wales, Australia, built as part of the Snowy Mountains Scheme to store water for hydroelectric power generation and irrigation.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c45d95a081908e7962ad215da746 completed April 16, 2026, 11:13 a.m.
NER Named-entity recognition batch_69ee885073888190ae49f967f72acbf8 completed April 26, 2026, 9:49 p.m.
Created at: April 16, 2026, 6:26 p.m.