Triple

T21520279
Position Surface form Disambiguated ID Type / Status
Subject Lockheed Martin X-27 E530956 entity
Predicate neverEnteredService P110291 FINISHED
Object true LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: true | Statement: [Lockheed Martin X-27, neverEnteredService, true]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: neverEnteredService
Context triple: [Lockheed Martin X-27, neverEnteredService, true]
  • A. neverActivatedBecause
    Indicates that an entity was not activated at any time specifically due to a stated preventing condition or reason.
  • B. neverLaunched chosen
    Indicates that an entity (such as a product, project, or mission) was planned or created but was never officially initiated, released, or put into operation.
  • C. enteredService
    Indicates that an entity began active use or operation at a specific time or in a specific context.
  • D. enteredServiceBefore
    Indicates that one entity began its period of service earlier in time than another entity.
  • E. neverPerformed
    Indicates that the specified action or event has not occurred at any time for the given entity or between the given entities.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c45d95a081908e7962ad215da746 completed April 16, 2026, 11:13 a.m.
NER Named-entity recognition batch_69ee884bfa548190a39e5992ed6bb8a8 completed April 26, 2026, 9:49 p.m.
PD Predicate disambiguation batch_69e6320043bc81909417c41a718652ba completed April 20, 2026, 2:02 p.m.
Created at: April 16, 2026, 6:26 p.m.