Triple

T21494780
Position Surface form Disambiguated ID Type / Status
Subject Beauharnois Canal E530322 entity
Predicate partOf P40 FINISHED
Object St. Lawrence River hydropower system NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: St. Lawrence River hydropower system | Statement: [Beauharnois Canal, partOf, St. Lawrence River hydropower system]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: St. Lawrence River hydropower system
Context triple: [Beauharnois Canal, partOf, St. Lawrence River hydropower system]
  • A. Ottawa River hydropower system
    The Ottawa River hydropower system is an interconnected network of dams and generating stations along the Ottawa River that produces hydroelectric power for surrounding regions in Canada.
  • B. Ontario hydroelectric system
    The Ontario hydroelectric system is a network of dams, generating stations, and related infrastructure that harnesses the province’s rivers and waterways to produce renewable electricity.
  • C. Niagara River hydropower system
    The Niagara River hydropower system is a large binational network of dams, tunnels, and generating stations on the Niagara River that harnesses the river’s flow and Niagara Falls to produce significant hydroelectric power for Canada and the United States.
  • D. St. Lawrence–FDR Power Project
    The St. Lawrence–FDR Power Project is a major hydroelectric generating facility on the St. Lawrence River that supplies renewable power to New York State and neighboring regions.
  • E. Niagara District
    The Niagara District was a historical administrative region in Upper Canada that encompassed the town of Newark (now Niagara-on-the-Lake) and surrounding areas along the Niagara River.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: St. Lawrence River hydropower system
Target entity description: The St. Lawrence River hydropower system is a network of dams, canals, and generating stations along the St. Lawrence River that harnesses its flow to produce large-scale hydroelectric power for Canada and the United States.
  • A. Ottawa River hydropower system
    The Ottawa River hydropower system is an interconnected network of dams and generating stations along the Ottawa River that produces hydroelectric power for surrounding regions in Canada.
  • B. Ontario hydroelectric system
    The Ontario hydroelectric system is a network of dams, generating stations, and related infrastructure that harnesses the province’s rivers and waterways to produce renewable electricity.
  • C. Niagara River hydropower system
    The Niagara River hydropower system is a large binational network of dams, tunnels, and generating stations on the Niagara River that harnesses the river’s flow and Niagara Falls to produce significant hydroelectric power for Canada and the United States.
  • D. St. Lawrence–FDR Power Project chosen
    The St. Lawrence–FDR Power Project is a major hydroelectric generating facility on the St. Lawrence River that supplies renewable power to New York State and neighboring regions.
  • E. Niagara District
    The Niagara District was a historical administrative region in Upper Canada that encompassed the town of Newark (now Niagara-on-the-Lake) and surrounding areas along the Niagara River.
  • F. None of above.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c45bd15481909fba5910765cdda2 completed April 16, 2026, 11:13 a.m.
NER Named-entity recognition batch_69e9ea575f2c81909cc0607c4b529f8d completed April 23, 2026, 9:45 a.m.
Created at: April 16, 2026, 6:23 p.m.