Triple
T21491775
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Bogus Basin Road corridor |
E530254
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | recreational access route |
C22778
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: recreational access route Context triple: [Bogus Basin Road corridor, instanceOf, recreational access route]
-
A.
recreation trail
A recreation trail is a designated path or route intended for non-motorized leisure activities such as walking, hiking, cycling, or horseback riding, often located in natural or scenic areas.
-
B.
hiking trail access point
chosen
A hiking trail access point is a designated location where hikers can enter or exit a trail, often featuring signage, parking, and basic amenities.
-
C.
climbing route feature
A climbing route feature is a distinct physical characteristic or structure on a rock face, wall, or artificial surface that influences how a climber moves, grips, or protects the route.
-
D.
public recreational area
A public recreational area is a shared outdoor or indoor space designed and maintained for community use, providing facilities and environments for leisure, exercise, social interaction, and relaxation.
-
E.
climbing route destination
A climbing route destination is a specific location or endpoint on a climbing route that climbers aim to reach, often defined by a particular hold, anchor, or ledge.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0c45bd15481909fba5910765cdda2 |
completed | April 16, 2026, 11:13 a.m. |
Created at: April 16, 2026, 6:22 p.m.