Triple

T21490823
Position Surface form Disambiguated ID Type / Status
Subject San Mateo County Regional Trails System E530230 entity
Predicate instanceOf P0 FINISHED
Object regional trail system C15867 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: regional trail system
Context triple: [San Mateo County Regional Trails System, instanceOf, regional trail system]
  • A. trail system chosen
    A trail system is an interconnected network of designated paths and routes designed to guide users through natural or built environments for recreation, transportation, or exploration.
  • B. rail trail
    A rail trail is a multi-use path created from a disused railway corridor, typically used for walking, cycling, and other non-motorized recreation and transportation.
  • C. recreation trail
    A recreation trail is a designated path or route intended for non-motorized leisure activities such as walking, hiking, cycling, or horseback riding, often located in natural or scenic areas.
  • D. long-distance hiking trail network
    A long-distance hiking trail network is an interconnected system of marked footpaths spanning large geographic areas, designed to support extended, multi-day trekking experiences between various natural and cultural destinations.
  • E. equestrian trail
    An equestrian trail is a designated path or route specifically designed and maintained for horseback riding, often featuring suitable terrain, signage, and accommodations for horses and riders.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c45bd15481909fba5910765cdda2 completed April 16, 2026, 11:13 a.m.
Created at: April 16, 2026, 6:22 p.m.