Triple

T21485183
Position Surface form Disambiguated ID Type / Status
Subject Flatiron Powerplant E530098 entity
Predicate category P87 FINISHED
Object United States Bureau of Reclamation power plants NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: United States Bureau of Reclamation power plants | Statement: [Flatiron Powerplant, category, United States Bureau of Reclamation power plants]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: United States Bureau of Reclamation power plants
Context triple: [Flatiron Powerplant, category, United States Bureau of Reclamation power plants]
  • A. Elephant Butte Dam power plant
    Elephant Butte Dam power plant is a hydroelectric facility in New Mexico that generates electricity using water released from Elephant Butte Reservoir on the Rio Grande.
  • B. Hetch Hetchy Power System
    The Hetch Hetchy Power System is a municipal hydroelectric power network that generates and delivers clean electricity to San Francisco and surrounding public facilities.
  • C. Moccasin Low-Head Generating Plant
    The Moccasin Low-Head Generating Plant is a hydroelectric power facility in California that forms part of the Hetch Hetchy system supplying electricity to the San Francisco Bay Area.
  • D. Leaburg Power Plant
    Leaburg Power Plant is a hydroelectric generating facility on the McKenzie River in Oregon, known for producing renewable electricity as part of the Leaburg Dam complex.
  • E. Fort Peck Power Plant
    Fort Peck Power Plant is a hydroelectric generating facility in Montana that converts water released from Fort Peck Dam into electrical power for the surrounding region.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: United States Bureau of Reclamation power plants
Target entity description: United States Bureau of Reclamation power plants are federally owned hydroelectric facilities that generate electricity as part of large water management and irrigation projects across the American West.
  • A. Elephant Butte Dam power plant chosen
    Elephant Butte Dam power plant is a hydroelectric facility in New Mexico that generates electricity using water released from Elephant Butte Reservoir on the Rio Grande.
  • B. Hetch Hetchy Power System
    The Hetch Hetchy Power System is a municipal hydroelectric power network that generates and delivers clean electricity to San Francisco and surrounding public facilities.
  • C. Moccasin Low-Head Generating Plant
    The Moccasin Low-Head Generating Plant is a hydroelectric power facility in California that forms part of the Hetch Hetchy system supplying electricity to the San Francisco Bay Area.
  • D. Leaburg Power Plant
    Leaburg Power Plant is a hydroelectric generating facility on the McKenzie River in Oregon, known for producing renewable electricity as part of the Leaburg Dam complex.
  • E. Fort Peck Power Plant
    Fort Peck Power Plant is a hydroelectric generating facility in Montana that converts water released from Fort Peck Dam into electrical power for the surrounding region.
  • F. None of above.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c45acc3881908e38d3f28964152b completed April 16, 2026, 11:13 a.m.
NER Named-entity recognition batch_69e9ea365a8481909635f614b23e751f completed April 23, 2026, 9:45 a.m.
Created at: April 16, 2026, 6:21 p.m.