Triple

T21485175
Position Surface form Disambiguated ID Type / Status
Subject Flatiron Powerplant E530098 entity
Predicate partOf P40 FINISHED
Object Colorado-Big Thompson water diversion and power generation project NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Colorado-Big Thompson water diversion and power generation project | Statement: [Flatiron Powerplant, partOf, Colorado-Big Thompson water diversion and power generation project]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Colorado-Big Thompson water diversion and power generation project
Context triple: [Flatiron Powerplant, partOf, Colorado-Big Thompson water diversion and power generation project]
  • A. Colorado-Big Thompson Project chosen
    The Colorado-Big Thompson Project is a major transbasin water diversion and storage system in Colorado that delivers Colorado River water to the arid eastern plains for agriculture, cities, and industry.
  • B. Boulder Canyon Project
    The Boulder Canyon Project was a major U.S. federal public works initiative of the early 20th century that authorized and funded the construction of Hoover Dam and related infrastructure on the Colorado River for flood control, irrigation, and hydroelectric power.
  • C. Shoshone Project
    The Shoshone Project is a U.S. Bureau of Reclamation irrigation and water management development in Wyoming that harnesses the Shoshone River through dams, reservoirs, and canals to support agriculture and regional growth.
  • D. Upper American River Project
    The Upper American River Project is a major hydroelectric power system in California’s Sierra Nevada that includes multiple dams, reservoirs, and powerhouses operated by the Sacramento Municipal Utility District.
  • E. Rio Grande Project
    The Rio Grande Project is a major U.S. Bureau of Reclamation irrigation and water management initiative on the Rio Grande that supplies water for agriculture, municipalities, and flood control in southern New Mexico and western Texas.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c45acc3881908e38d3f28964152b completed April 16, 2026, 11:13 a.m.
NER Named-entity recognition batch_69e9ea365a8481909635f614b23e751f completed April 23, 2026, 9:45 a.m.
Created at: April 16, 2026, 6:21 p.m.