Triple

T21485174
Position Surface form Disambiguated ID Type / Status
Subject Flatiron Powerplant E530098 entity
Predicate connectedTo P37 FINISHED
Object Horsetooth Reservoir NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Horsetooth Reservoir | Statement: [Flatiron Powerplant, connectedTo, Horsetooth Reservoir]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Horsetooth Reservoir
Context triple: [Flatiron Powerplant, connectedTo, Horsetooth Reservoir]
  • A. Horsetooth Reservoir chosen
    Horsetooth Reservoir is a large man-made lake near Fort Collins, Colorado, popular for recreation and water storage as part of the region’s major water supply system.
  • B. Palisade Reservoir
    Palisade Reservoir is a man-made lake in central Utah used primarily for irrigation, recreation, and local water storage.
  • C. Buffalo Bill Reservoir
    Buffalo Bill Reservoir is a large man-made lake in northwest Wyoming formed by the Buffalo Bill Dam on the Shoshone River, popular for fishing, boating, and outdoor recreation.
  • D. Squaw Creek Reservoir
    Squaw Creek Reservoir is a man-made lake in Texas primarily known for serving as the cooling water source for the Comanche Peak Nuclear Power Plant.
  • E. Ochoco Reservoir
    Ochoco Reservoir is a man-made lake in central Oregon popular for fishing, boating, and outdoor recreation near the city of Prineville.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c45acc3881908e38d3f28964152b completed April 16, 2026, 11:13 a.m.
NER Named-entity recognition batch_69e9ea365a8481909635f614b23e751f completed April 23, 2026, 9:45 a.m.
Created at: April 16, 2026, 6:21 p.m.