Triple

T21485167
Position Surface form Disambiguated ID Type / Status
Subject Flatiron Powerplant E530098 entity
Predicate watercourse P415 FINISHED
Object Colorado-Big Thompson water diversion system NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Colorado-Big Thompson water diversion system | Statement: [Flatiron Powerplant, watercourse, Colorado-Big Thompson water diversion system]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Colorado-Big Thompson water diversion system
Context triple: [Flatiron Powerplant, watercourse, Colorado-Big Thompson water diversion system]
  • A. Colorado-Big Thompson Project chosen
    The Colorado-Big Thompson Project is a major transbasin water diversion and storage system in Colorado that delivers Colorado River water to the arid eastern plains for agriculture, cities, and industry.
  • B. Colorado River Storage and Regulation System
    The Colorado River Storage and Regulation System is a network of dams, reservoirs, and related infrastructure designed to manage, store, and control the flow of the Colorado River for water supply, flood control, and hydroelectric power generation.
  • C. Shoshone Project
    The Shoshone Project is a U.S. Bureau of Reclamation irrigation and water management development in Wyoming that harnesses the Shoshone River through dams, reservoirs, and canals to support agriculture and regional growth.
  • D. Rio Grande Project
    The Rio Grande Project is a major U.S. Bureau of Reclamation irrigation and water management initiative on the Rio Grande that supplies water for agriculture, municipalities, and flood control in southern New Mexico and western Texas.
  • E. Upper American River Project
    The Upper American River Project is a major hydroelectric power system in California’s Sierra Nevada that includes multiple dams, reservoirs, and powerhouses operated by the Sacramento Municipal Utility District.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c45acc3881908e38d3f28964152b completed April 16, 2026, 11:13 a.m.
NER Named-entity recognition batch_69e9ea365a8481909635f614b23e751f completed April 23, 2026, 9:45 a.m.
Created at: April 16, 2026, 6:21 p.m.