Triple

T21485154
Position Surface form Disambiguated ID Type / Status
Subject Green Mountain Reservoir E530097 entity
Predicate supportsUse P15794 FINISHED
Object hydroelectric power production at Green Mountain Dam LITERAL FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: hydroelectric power production at Green Mountain Dam | Statement: [Green Mountain Reservoir, supportsUse, hydroelectric power production at Green Mountain Dam]

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c45acc3881908e38d3f28964152b completed April 16, 2026, 11:13 a.m.
NER Named-entity recognition batch_69e9ea365a8481909635f614b23e751f completed April 23, 2026, 9:45 a.m.
Created at: April 16, 2026, 6:21 p.m.