Triple

T21484952
Position Surface form Disambiguated ID Type / Status
Subject Northern Colorado Water Conservancy District E530093 entity
Predicate projectOperated P144535 FINISHED
Object Colorado-Big Thompson Project NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Colorado-Big Thompson Project | Statement: [Northern Colorado Water Conservancy District, projectOperated, Colorado-Big Thompson Project]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Colorado-Big Thompson Project
Context triple: [Northern Colorado Water Conservancy District, projectOperated, Colorado-Big Thompson Project]
  • A. Colorado-Big Thompson Project chosen
    The Colorado-Big Thompson Project is a major transbasin water diversion and storage system in Colorado that delivers Colorado River water to the arid eastern plains for agriculture, cities, and industry.
  • B. Shoshone Project
    The Shoshone Project is a U.S. Bureau of Reclamation irrigation and water management development in Wyoming that harnesses the Shoshone River through dams, reservoirs, and canals to support agriculture and regional growth.
  • C. Upper American River Project
    The Upper American River Project is a major hydroelectric power system in California’s Sierra Nevada that includes multiple dams, reservoirs, and powerhouses operated by the Sacramento Municipal Utility District.
  • D. Rio Grande Project
    The Rio Grande Project is a major U.S. Bureau of Reclamation irrigation and water management initiative on the Rio Grande that supplies water for agriculture, municipalities, and flood control in southern New Mexico and western Texas.
  • E. Boulder Canyon Project
    The Boulder Canyon Project was a major U.S. federal public works initiative of the early 20th century that authorized and funded the construction of Hoover Dam and related infrastructure on the Colorado River for flood control, irrigation, and hydroelectric power.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: projectOperated
Context triple: [Northern Colorado Water Conservancy District, projectOperated, Colorado-Big Thompson Project]
  • A. programOperation
    Indicates an operation or action performed by, within, or upon a program in a computational or procedural context.
  • B. operateIn
    Indicates that an entity performs its activities, functions, or services within a specified location, context, or domain.
  • C. operationOf
    Indicates that one entity is the function, activity, or process carried out by another entity (such as a system, device, or organization).
  • D. operationalTask
    Indicates that an entity is engaged in, responsible for, or associated with a specific operational activity or task within a process or system.
  • E. operatedAs
    Indicates that an entity functioned or was used in the capacity, role, or identity of another entity for some period of time.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c45acc3881908e38d3f28964152b completed April 16, 2026, 11:13 a.m.
NER Named-entity recognition batch_69e9ea365a8481909635f614b23e751f completed April 23, 2026, 9:45 a.m.
PD Predicate disambiguation batch_69e631ec1d048190b6da97da8222e413 completed April 20, 2026, 2:02 p.m.
PDg Predicate description generation batch_69e6386c5a4481909c37f7de7e9fc025 completed April 20, 2026, 2:30 p.m.
Created at: April 16, 2026, 6:21 p.m.