Triple

T21478466
Position Surface form Disambiguated ID Type / Status
Subject Qazigund E529923 entity
Predicate hasTransportConnection P845 FINISHED
Object Pir Panjal Railway Tunnel NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Pir Panjal Railway Tunnel | Statement: [Qazigund, hasTransportConnection, Pir Panjal Railway Tunnel]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Pir Panjal Railway Tunnel
Context triple: [Qazigund, hasTransportConnection, Pir Panjal Railway Tunnel]
  • A. Atal Tunnel (Rohtang)
    Atal Tunnel (Rohtang) is a high-altitude road tunnel in the Indian Himalayas that provides all-weather connectivity between Manali and the Lahaul-Spiti region by bypassing the Rohtang Pass.
  • B. Shela Bagh Tunnel
    Shela Bagh Tunnel is a historic railway tunnel in Balochistan, Pakistan, known as one of the longest and most significant tunnels on the region’s mountainous rail routes.
  • C. Banihal road tunnel
    The Banihal road tunnel is a key highway tunnel in the Pir Panjal range of Jammu and Kashmir, India, providing an all-weather road link between the Kashmir Valley and the Jammu region.
  • D. Lowari Tunnel
    Lowari Tunnel is a strategic road tunnel in Pakistan that provides a safer, all-weather route through the mountainous Lowari Pass, improving connectivity between Chitral and the rest of the country.
  • E. Karori Tunnel
    Karori Tunnel is a historic road tunnel in Wellington, New Zealand, providing a key transport link between the suburb of Karori and the city.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Pir Panjal Railway Tunnel
Target entity description: The Pir Panjal Railway Tunnel is one of India’s longest transportation tunnels, carrying the Jammu–Baramulla railway line through the Pir Panjal Range to connect the Kashmir Valley with the rest of the country.
  • A. Atal Tunnel (Rohtang)
    Atal Tunnel (Rohtang) is a high-altitude road tunnel in the Indian Himalayas that provides all-weather connectivity between Manali and the Lahaul-Spiti region by bypassing the Rohtang Pass.
  • B. Shela Bagh Tunnel
    Shela Bagh Tunnel is a historic railway tunnel in Balochistan, Pakistan, known as one of the longest and most significant tunnels on the region’s mountainous rail routes.
  • C. Banihal road tunnel
    The Banihal road tunnel is a key highway tunnel in the Pir Panjal range of Jammu and Kashmir, India, providing an all-weather road link between the Kashmir Valley and the Jammu region.
  • D. Lowari Tunnel
    Lowari Tunnel is a strategic road tunnel in Pakistan that provides a safer, all-weather route through the mountainous Lowari Pass, improving connectivity between Chitral and the rest of the country.
  • E. Karori Tunnel
    Karori Tunnel is a historic road tunnel in Wellington, New Zealand, providing a key transport link between the suburb of Karori and the city.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c45acc3881908e38d3f28964152b completed April 16, 2026, 11:13 a.m.
NER Named-entity recognition batch_69e9ea1951fc8190910f634327aa5c3f completed April 23, 2026, 9:44 a.m.
Created at: April 16, 2026, 6:20 p.m.