Triple

T21469133
Position Surface form Disambiguated ID Type / Status
Subject Três Irmãos Dam E529676 entity
Predicate hasNameInPortuguese P1435 FINISHED
Object Usina Hidrelétrica de Três Irmãos NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Usina Hidrelétrica de Três Irmãos | Statement: [Três Irmãos Dam, hasNameInPortuguese, Usina Hidrelétrica de Três Irmãos]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Usina Hidrelétrica de Três Irmãos
Context triple: [Três Irmãos Dam, hasNameInPortuguese, Usina Hidrelétrica de Três Irmãos]
  • A. Paulo Afonso Hydroelectric Complex
    The Paulo Afonso Hydroelectric Complex is a major Brazilian hydroelectric power facility on the São Francisco River, known for its large cascade of dams and significant contribution to the country’s electricity supply.
  • B. Santo Antônio Dam
    Santo Antônio Dam is a large hydroelectric power plant in Brazil, built on the Madeira River near Porto Velho to generate electricity as part of the Madeira River energy complex.
  • C. Belo Monte Dam
    The Belo Monte Dam is a massive hydroelectric complex in Brazil’s Amazon region, known for its high power capacity and significant environmental and social controversy.
  • D. Sobradinho Dam
    Sobradinho Dam is a large hydroelectric and flood-control dam on Brazil’s São Francisco River, notable for creating one of the world’s largest artificial reservoirs.
  • E. Itaparica Dam
    Itaparica Dam is a large hydroelectric dam and reservoir complex on Brazil’s São Francisco River, primarily used for power generation and water regulation.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Usina Hidrelétrica de Três Irmãos
Target entity description: Usina Hidrelétrica de Três Irmãos is a major hydroelectric power plant and dam complex located on the Tietê River in the state of São Paulo, Brazil.
  • A. Paulo Afonso Hydroelectric Complex
    The Paulo Afonso Hydroelectric Complex is a major Brazilian hydroelectric power facility on the São Francisco River, known for its large cascade of dams and significant contribution to the country’s electricity supply.
  • B. Santo Antônio Dam
    Santo Antônio Dam is a large hydroelectric power plant in Brazil, built on the Madeira River near Porto Velho to generate electricity as part of the Madeira River energy complex.
  • C. Belo Monte Dam
    The Belo Monte Dam is a massive hydroelectric complex in Brazil’s Amazon region, known for its high power capacity and significant environmental and social controversy.
  • D. Sobradinho Dam
    Sobradinho Dam is a large hydroelectric and flood-control dam on Brazil’s São Francisco River, notable for creating one of the world’s largest artificial reservoirs.
  • E. Itaparica Dam
    Itaparica Dam is a large hydroelectric dam and reservoir complex on Brazil’s São Francisco River, primarily used for power generation and water regulation.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c459acb481909bb6ee452a0045c7 completed April 16, 2026, 11:13 a.m.
NER Named-entity recognition batch_69e9e9f58f6c8190a3d2fc8f820a9925 completed April 23, 2026, 9:44 a.m.
Created at: April 16, 2026, 6:16 p.m.