Triple

T21469125
Position Surface form Disambiguated ID Type / Status
Subject Três Irmãos Dam E529676 entity
Predicate isPartOfSystemWith P840 FINISHED
Object Jupiá Dam NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Jupiá Dam | Statement: [Três Irmãos Dam, isPartOfSystemWith, Jupiá Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Jupiá Dam
Context triple: [Três Irmãos Dam, isPartOfSystemWith, Jupiá Dam]
  • A. Jupiá Dam chosen
    Jupiá Dam is a major hydroelectric dam on the Paraná River in Brazil, contributing significantly to the region’s power generation within the broader Paraná River hydroelectric complex.
  • B. Rosana Dam
    Rosana Dam is a hydroelectric dam on the Paranapanema River in Brazil, used for generating electricity as part of the broader Paraná River basin power system.
  • C. Barra Bonita Dam
    Barra Bonita Dam is a hydroelectric and navigation dam complex in the state of São Paulo, Brazil, known for regulating the Tietê River and forming the Barra Bonita Reservoir.
  • D. Angostura Dam
    Angostura Dam is a hydroelectric power facility located on Chile’s Biobío River, contributing to the country’s renewable energy generation.
  • E. Angostura Dam
    Angostura Dam is a major hydroelectric dam in Mexico that forms part of the country’s important Grijalva River power generation system.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c459acb481909bb6ee452a0045c7 completed April 16, 2026, 11:13 a.m.
NER Named-entity recognition batch_69e9e9f58f6c8190a3d2fc8f820a9925 completed April 23, 2026, 9:44 a.m.
Created at: April 16, 2026, 6:16 p.m.