Triple

T21455989
Position Surface form Disambiguated ID Type / Status
Subject Central Arizona Project E529337 entity
Predicate hasComponent P35 FINISHED
Object Havasu Pumping Plant NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Havasu Pumping Plant | Statement: [Central Arizona Project, hasComponent, Havasu Pumping Plant]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Havasu Pumping Plant
Context triple: [Central Arizona Project, hasComponent, Havasu Pumping Plant]
  • A. Bouse Hills Pumping Plant
    Bouse Hills Pumping Plant is a major water-lifting facility within the Central Arizona Project system that helps convey Colorado River water across central Arizona.
  • B. Tracy Pumping Plant
    Tracy Pumping Plant is a major water pumping facility in California that lifts and conveys water from the Sacramento–San Joaquin Delta into the Central Valley Project’s distribution system.
  • C. Harvey O. Banks Pumping Plant
    The Harvey O. Banks Pumping Plant is a major water pumping facility in California that serves as a key intake and distribution hub for the State Water Project.
  • D. Jones Pumping Plant
    Jones Pumping Plant is a major water pumping facility in California’s Central Valley that lifts and conveys water from the Sacramento-San Joaquin Delta into the Central Valley Project’s distribution system.
  • E. Mark Wilmer Pumping Plant
    Mark Wilmer Pumping Plant is a major water pumping facility in Arizona that lifts Colorado River water as part of the Central Arizona Project’s large-scale water delivery system.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Havasu Pumping Plant
Target entity description: Havasu Pumping Plant is a major water-lifting facility on the Colorado River that helps move water into Arizona as part of the Central Arizona Project aqueduct system.
  • A. Bouse Hills Pumping Plant
    Bouse Hills Pumping Plant is a major water-lifting facility within the Central Arizona Project system that helps convey Colorado River water across central Arizona.
  • B. Tracy Pumping Plant
    Tracy Pumping Plant is a major water pumping facility in California that lifts and conveys water from the Sacramento–San Joaquin Delta into the Central Valley Project’s distribution system.
  • C. Harvey O. Banks Pumping Plant
    The Harvey O. Banks Pumping Plant is a major water pumping facility in California that serves as a key intake and distribution hub for the State Water Project.
  • D. Jones Pumping Plant
    Jones Pumping Plant is a major water pumping facility in California’s Central Valley that lifts and conveys water from the Sacramento-San Joaquin Delta into the Central Valley Project’s distribution system.
  • E. Mark Wilmer Pumping Plant chosen
    Mark Wilmer Pumping Plant is a major water pumping facility in Arizona that lifts Colorado River water as part of the Central Arizona Project’s large-scale water delivery system.
  • F. None of above.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c458133481908ae8b41a12c4edec completed April 16, 2026, 11:13 a.m.
NER Named-entity recognition batch_69e9e9d6da3c819082a495f5434c5554 completed April 23, 2026, 9:43 a.m.
Created at: April 16, 2026, 6:08 p.m.