Triple
T21455989
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Central Arizona Project |
E529337
|
entity |
| Predicate | hasComponent |
P35
|
FINISHED |
| Object | Havasu Pumping Plant |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Havasu Pumping Plant | Statement: [Central Arizona Project, hasComponent, Havasu Pumping Plant]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Havasu Pumping Plant Context triple: [Central Arizona Project, hasComponent, Havasu Pumping Plant]
-
A.
Bouse Hills Pumping Plant
Bouse Hills Pumping Plant is a major water-lifting facility within the Central Arizona Project system that helps convey Colorado River water across central Arizona.
-
B.
Tracy Pumping Plant
Tracy Pumping Plant is a major water pumping facility in California that lifts and conveys water from the Sacramento–San Joaquin Delta into the Central Valley Project’s distribution system.
-
C.
Harvey O. Banks Pumping Plant
The Harvey O. Banks Pumping Plant is a major water pumping facility in California that serves as a key intake and distribution hub for the State Water Project.
-
D.
Jones Pumping Plant
Jones Pumping Plant is a major water pumping facility in California’s Central Valley that lifts and conveys water from the Sacramento-San Joaquin Delta into the Central Valley Project’s distribution system.
-
E.
Mark Wilmer Pumping Plant
Mark Wilmer Pumping Plant is a major water pumping facility in Arizona that lifts Colorado River water as part of the Central Arizona Project’s large-scale water delivery system.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Havasu Pumping Plant Target entity description: Havasu Pumping Plant is a major water-lifting facility on the Colorado River that helps move water into Arizona as part of the Central Arizona Project aqueduct system.
-
A.
Bouse Hills Pumping Plant
Bouse Hills Pumping Plant is a major water-lifting facility within the Central Arizona Project system that helps convey Colorado River water across central Arizona.
-
B.
Tracy Pumping Plant
Tracy Pumping Plant is a major water pumping facility in California that lifts and conveys water from the Sacramento–San Joaquin Delta into the Central Valley Project’s distribution system.
-
C.
Harvey O. Banks Pumping Plant
The Harvey O. Banks Pumping Plant is a major water pumping facility in California that serves as a key intake and distribution hub for the State Water Project.
-
D.
Jones Pumping Plant
Jones Pumping Plant is a major water pumping facility in California’s Central Valley that lifts and conveys water from the Sacramento-San Joaquin Delta into the Central Valley Project’s distribution system.
-
E.
Mark Wilmer Pumping Plant
chosen
Mark Wilmer Pumping Plant is a major water pumping facility in Arizona that lifts Colorado River water as part of the Central Arizona Project’s large-scale water delivery system.
- F. None of above.
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0c458133481908ae8b41a12c4edec |
completed | April 16, 2026, 11:13 a.m. |
| NER | Named-entity recognition | batch_69e9e9d6da3c819082a495f5434c5554 |
completed | April 23, 2026, 9:43 a.m. |
Created at: April 16, 2026, 6:08 p.m.