Triple

T21453013
Position Surface form Disambiguated ID Type / Status
Subject Helena River E529265 entity
Predicate hasReservoir P1025 FINISHED
Object Mundaring Weir NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Mundaring Weir | Statement: [Helena River, hasReservoir, Mundaring Weir]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Mundaring Weir
Context triple: [Helena River, hasReservoir, Mundaring Weir]
  • A. Mundaring Weir chosen
    Mundaring Weir is a historic dam and reservoir in Western Australia that forms a key part of Perth’s water supply and the Goldfields Water Supply Scheme.
  • B. Torrens Weir
    Torrens Weir is a low dam structure on the River Torrens in Adelaide, South Australia, that creates the ornamental Torrens Lake in the city’s parklands.
  • C. Moondarra Dam
    Moondarra Dam is a major water storage and irrigation structure in Queensland, Australia, built to supply water to the nearby city of Mount Isa and its mining operations.
  • D. Ross River Dam
    Ross River Dam is a major water storage and flood mitigation structure near Townsville in Queensland, Australia, supplying drinking water and helping protect the region from flooding.
  • E. Talbingo Dam
    Talbingo Dam is a major rockfill embankment dam in New South Wales, Australia, forming part of the Snowy Mountains Scheme and creating Talbingo Reservoir for hydroelectric power generation and water storage.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c457579481909db68053ed99750c completed April 16, 2026, 11:13 a.m.
NER Named-entity recognition batch_69e9e9d426d88190ae87ae9fac9c30a0 completed April 23, 2026, 9:43 a.m.
Created at: April 16, 2026, 6:07 p.m.