Triple

T2144948
Position Surface form Disambiguated ID Type / Status
Subject Air Defence Control Centre E47042 entity
Predicate instanceOf P0 FINISHED
Object military command facility C1086 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: military command facility
Context triple: [Air Defence Control Centre, instanceOf, military command facility]
  • A. military installation chosen
    A military installation is a designated facility or area where armed forces are stationed, trained, equipped, and supported to conduct defense and security operations.
  • B. army commander post
    An army commander post is a designated command facility or position from which a military commander directs, coordinates, and controls the operations of assigned forces.
  • C. military fortification system
    A military fortification system is an integrated network of defensive structures, obstacles, and support facilities designed to protect territory, forces, and strategic assets from enemy attack.
  • D. military structure
    A military structure is an organized framework of ranks, units, and command relationships that defines how armed forces are arranged, governed, and coordinated to conduct operations.
  • E. United States Army installation
    A United States Army installation is a designated military facility, base, or post that supports the housing, training, operations, logistics, and administration of Army personnel and equipment.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a88a1933e0819094f18426ed74180f completed March 4, 2026, 7:38 p.m.
Created at: March 4, 2026, 7:44 p.m.