Triple

T21442792
Position Surface form Disambiguated ID Type / Status
Subject A29 motorway (Portugal) E528980 entity
Predicate instanceOf P0 FINISHED
Object Portuguese motorway C3788 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Portuguese motorway
Context triple: [A29 motorway (Portugal), instanceOf, Portuguese motorway]
  • A. road in Portugal
    A road in Portugal is a designated transportation route within Portuguese territory, ranging from local streets to national highways, that facilitates vehicular and pedestrian movement while adhering to the country’s traffic regulations and infrastructure standards.
  • B. federal highway in Brazil
    A federal highway in Brazil is a major roadway managed by the federal government that connects different states, regions, and key cities to support national transportation and economic integration.
  • C. motorway chosen
    A motorway is a high-capacity, multi-lane road designed for fast, long-distance vehicular travel with controlled access and no at-grade intersections.
  • D. trans-European road
    A trans-European road is a major transportation route that crosses multiple European countries, facilitating international travel and trade across the continent.
  • E. Mexican Federal Highway
    A Mexican Federal Highway is a nationally administered roadway forming part of Mexico’s primary highway network, designed to connect major cities, regions, and borders for long-distance vehicular travel.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c4569fa081908101baa24f8745db completed April 16, 2026, 11:13 a.m.
Created at: April 16, 2026, 6:05 p.m.