Triple

T21442790
Position Surface form Disambiguated ID Type / Status
Subject A6 motorway (Portugal) E528979 entity
Predicate isPartOf P10 FINISHED
Object Lisbon–Madrid road corridor NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Lisbon–Madrid road corridor | Statement: [A6 motorway (Portugal), isPartOf, Lisbon–Madrid road corridor]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Lisbon–Madrid road corridor
Context triple: [A6 motorway (Portugal), isPartOf, Lisbon–Madrid road corridor]
  • A. Madrid–Valencia road
    The Madrid–Valencia road is a major Spanish highway that connects the capital city of Madrid with the Mediterranean port city of Valencia, serving as a key route for both regional and long-distance traffic.
  • B. Madrid–Galicia corridor
    The Madrid–Galicia corridor is a major transport axis in Spain linking the capital Madrid with the northwestern region of Galicia through a network of highways and rail lines.
  • C. Barcelona–Tarragona corridor
    The Barcelona–Tarragona corridor is a major transportation axis in Catalonia, Spain, linking the metropolitan area of Barcelona with the coastal city of Tarragona through road and rail infrastructure.
  • D. Lisbon–Braga route
    The Lisbon–Braga route is a major intercity rail corridor in Portugal linking the capital Lisbon with the northern city of Braga.
  • E. Autovía A-1
    Autovía A-1 is a major Spanish motorway that forms part of the route between Madrid and the northern regions of Spain, including the Basque Country.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Lisbon–Madrid road corridor
Target entity description: The Lisbon–Madrid road corridor is a major transnational highway route linking Portugal’s capital Lisbon with Spain’s capital Madrid, facilitating significant passenger and freight transport between the two Iberian countries.
  • A. Madrid–Valencia road
    The Madrid–Valencia road is a major Spanish highway that connects the capital city of Madrid with the Mediterranean port city of Valencia, serving as a key route for both regional and long-distance traffic.
  • B. Madrid–Galicia corridor
    The Madrid–Galicia corridor is a major transport axis in Spain linking the capital Madrid with the northwestern region of Galicia through a network of highways and rail lines.
  • C. Barcelona–Tarragona corridor
    The Barcelona–Tarragona corridor is a major transportation axis in Catalonia, Spain, linking the metropolitan area of Barcelona with the coastal city of Tarragona through road and rail infrastructure.
  • D. Lisbon–Braga route
    The Lisbon–Braga route is a major intercity rail corridor in Portugal linking the capital Lisbon with the northern city of Braga.
  • E. Autovía A-1
    Autovía A-1 is a major Spanish motorway that forms part of the route between Madrid and the northern regions of Spain, including the Basque Country.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c4569fa081908101baa24f8745db completed April 16, 2026, 11:13 a.m.
NER Named-entity recognition batch_69e8b7044a3881908a7fe26f26c92762 completed April 22, 2026, 11:54 a.m.
Created at: April 16, 2026, 6:05 p.m.