Triple
T21423145
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Dave Lebling |
E528486
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Infocom implementor |
C44757
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Infocom implementor Context triple: [Dave Lebling, instanceOf, Infocom implementor]
-
A.
GPRS packet control unit implementation
A GPRS packet control unit implementation is the software and hardware logic that manages radio resource allocation, packet scheduling, and data flow control between mobile stations and the core network in a GPRS system.
-
B.
Management Information Base specification
A Management Information Base specification defines the structured set of managed objects, their attributes, and relationships used by network management protocols (such as SNMP) to monitor and control devices in a networked environment.
-
C.
internet protocol suite
The internet protocol suite is a conceptual framework of layered communication protocols (including TCP/IP) that defines how data is formatted, addressed, transmitted, routed, and received across interconnected computer networks.
-
D.
IEEE 802.21 feature set
The IEEE 802.21 feature set comprises mechanisms and protocols that enable seamless media-independent handover and service continuity across heterogeneous wireless and wired networks.
-
E.
ARPANET node
An ARPANET node is a computer or host system connected to the ARPANET network that sends, receives, and routes data packets using early packet-switching protocols.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0c455f3688190810bc96365791b0f |
completed | April 16, 2026, 11:13 a.m. |
Created at: April 16, 2026, 5:48 p.m.