Triple

T21408925
Position Surface form Disambiguated ID Type / Status
Subject Paine E528114 entity
Predicate hasTransportConnection P845 FINISHED
Object Chile Route 5 NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Chile Route 5 | Statement: [Paine, hasTransportConnection, Chile Route 5]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Chile Route 5
Context triple: [Paine, hasTransportConnection, Chile Route 5]
  • A. Chile Route 7
    Chile Route 7, also known as the Carretera Austral, is a remote and scenic highway in southern Chile that winds through Patagonia’s fjords, forests, and national parks.
  • B. Chile Route 27
    Chile Route 27 is a high-altitude highway in northern Chile that connects the city of San Pedro de Atacama to the Jama Pass on the border with Argentina, crossing the Andes through the Atacama Desert.
  • C. Chile Route 60
    Chile Route 60 is a major highway in central Chile that connects the coastal city of Valparaíso with the Andes and the Argentine border, serving as a key international transit corridor.
  • D. Ruta Nacional 9
    Ruta Nacional 9 is a major Argentine highway that runs from Buenos Aires through several northern provinces to the Bolivian border, serving as a key transportation corridor in the country.
  • E. Ruta Nacional 5
    Ruta Nacional 5 is a major Argentine highway that connects Buenos Aires with the interior of the Buenos Aires and La Pampa provinces, serving as an important transportation corridor in central Argentina.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Chile Route 5
Target entity description: Chile Route 5 is the main north–south highway of Chile, forming the backbone of the country’s road network and a key segment of the Pan-American Highway.
  • A. Chile Route 7
    Chile Route 7, also known as the Carretera Austral, is a remote and scenic highway in southern Chile that winds through Patagonia’s fjords, forests, and national parks.
  • B. Chile Route 27
    Chile Route 27 is a high-altitude highway in northern Chile that connects the city of San Pedro de Atacama to the Jama Pass on the border with Argentina, crossing the Andes through the Atacama Desert.
  • C. Chile Route 60
    Chile Route 60 is a major highway in central Chile that connects the coastal city of Valparaíso with the Andes and the Argentine border, serving as a key international transit corridor.
  • D. Ruta Nacional 9
    Ruta Nacional 9 is a major Argentine highway that runs from Buenos Aires through several northern provinces to the Bolivian border, serving as a key transportation corridor in the country.
  • E. Ruta Nacional 5
    Ruta Nacional 5 is a major Argentine highway that connects Buenos Aires with the interior of the Buenos Aires and La Pampa provinces, serving as an important transportation corridor in central Argentina.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b520ee3c8190abddbee7e37e834c completed April 16, 2026, 10:08 a.m.
NER Named-entity recognition batch_69e8b1b316a48190ad43394dc35a54e0 completed April 22, 2026, 11:32 a.m.
Created at: April 16, 2026, 5:33 p.m.