Triple
T21396490
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Amazon fulfillment center near Middletown |
E527799
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | warehouse and distribution facility |
C23444
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: warehouse and distribution facility Context triple: [Amazon fulfillment center near Middletown, instanceOf, warehouse and distribution facility]
-
A.
industrial storage facility
An industrial storage facility is a large, purpose-built structure designed to securely house, organize, and manage bulk materials, goods, or equipment used in manufacturing, logistics, or distribution operations.
-
B.
warehouse building
chosen
A warehouse building is a large, typically open-plan structure designed for the storage, handling, and distribution of goods and materials.
-
C.
storage and distribution system
A storage and distribution system is an integrated arrangement of facilities, equipment, and processes designed to efficiently receive, store, manage, and deliver goods or resources to their intended destinations.
-
D.
library storage facility
A library storage facility is a specialized space designed to house, preserve, and organize less frequently used library materials in a secure, climate-controlled environment while keeping them retrievable on demand.
-
E.
warehousing company
A warehousing company is a business that stores, manages, and handles goods and inventory on behalf of other organizations, often providing related services like packaging, distribution, and logistics coordination.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0b51ff3748190935c0a513c62a12b |
completed | April 16, 2026, 10:08 a.m. |
Created at: April 16, 2026, 5:13 p.m.