Triple

T21395234
Position Surface form Disambiguated ID Type / Status
Subject Marion, Illinois E527761 entity
Predicate majorHighway P385 FINISHED
Object Illinois Route 13 NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Illinois Route 13 | Statement: [Marion, Illinois, majorHighway, Illinois Route 13]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Illinois Route 13
Context triple: [Marion, Illinois, majorHighway, Illinois Route 13]
  • A. Illinois Route 13 chosen
    Illinois Route 13 is a primary east–west state highway in southern Illinois that connects several key cities and serves as a major regional transportation corridor.
  • B. Illinois Route 15
    Illinois Route 15 is an east–west state highway in southern Illinois that connects several communities, including the city of Belleville.
  • C. Illinois Route 17
    Illinois Route 17 is an east–west state highway in northern Illinois that runs across multiple counties, connecting rural communities and regional routes.
  • D. Illinois Route 18
    Illinois Route 18 is an east–west state highway in central Illinois that connects several small communities and rural areas to larger regional routes.
  • E. Illinois Route 14
    Illinois Route 14 is an east–west state highway in southern Illinois that connects several communities as part of the state’s primary road network.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b51ff3748190935c0a513c62a12b completed April 16, 2026, 10:08 a.m.
NER Named-entity recognition batch_69ee62cd30f08190aba90afed6116a2a completed April 26, 2026, 7:09 p.m.
Created at: April 16, 2026, 5:13 p.m.