Triple

T2139355
Position Surface form Disambiguated ID Type / Status
Subject Space Telescope Imaging Spectrograph E46724 entity
Predicate experiencedFailure P37047 FINISHED
Object power supply failure in 2004 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: power supply failure in 2004 | Statement: [Space Telescope Imaging Spectrograph, experiencedFailure, power supply failure in 2004]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: experiencedFailure
Context triple: [Space Telescope Imaging Spectrograph, experiencedFailure, power supply failure in 2004]
  • A. failedOn
    Indicates that an attempted action or process did not succeed when applied to a specific target, condition, or step.
  • B. missionFailure
    Indicates that an attempted mission or operation did not achieve its intended objectives or outcome.
  • C. failedLaunches
    Indicates that one or more attempts to launch something (e.g., a product, project, or mission) did not succeed.
  • D. fallCause
    Indicates that one event or condition causes or brings about another event of falling or decline.
  • E. launchFailures
    Indicates that attempts to initiate or start an operation, process, or system have failed.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a88a174ab48190a5db20c132e5dccf completed March 4, 2026, 7:37 p.m.
NER Named-entity recognition batch_69abbf74147c81908793c3694894f94a completed March 7, 2026, 6:02 a.m.
PD Predicate disambiguation batch_69abbd96a3b0819081efbfef975e1513 completed March 7, 2026, 5:54 a.m.
PDg Predicate description generation batch_69abbf71edf08190add69022aabfd49d completed March 7, 2026, 6:02 a.m.
Created at: March 4, 2026, 7:44 p.m.