Triple

T2139318
Position Surface form Disambiguated ID Type / Status
Subject Space Telescope Imaging Spectrograph E46724 entity
Predicate repairedByMission P14270 FINISHED
Object STS-125 E49339 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: STS-125 | Statement: [Space Telescope Imaging Spectrograph, repairedByMission, STS-125]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: STS-125
Context triple: [Space Telescope Imaging Spectrograph, repairedByMission, STS-125]
  • A. STS-125 chosen
    STS-125 was NASA’s final Space Shuttle servicing mission to upgrade and repair the Hubble Space Telescope, extending its scientific capabilities and operational life.
  • B. STS-133
    STS-133 was a 2011 NASA Space Shuttle mission that delivered supplies and the Permanent Multipurpose Module to the International Space Station as part of the final flights of the shuttle program.
  • C. STS-134
    STS-134 was the penultimate mission of NASA’s Space Shuttle program, a 2011 flight of Endeavour to the International Space Station that delivered the Alpha Magnetic Spectrometer and other critical hardware.
  • D. STS-135
    STS-135 was the final mission of NASA’s Space Shuttle program, flown by Atlantis in 2011 to resupply the International Space Station and conclude the shuttle era.
  • E. STS-115
    STS-115 was a 2006 NASA Space Shuttle Atlantis mission that resumed International Space Station construction by delivering and installing a major truss segment and associated hardware.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: repairedByMission
Context triple: [Space Telescope Imaging Spectrograph, repairedByMission, STS-125]
  • A. fixedBy chosen
    Indicates that one entity is repaired, corrected, or resolved through the action or intervention of another entity.
  • B. typeOfMission
    Indicates the specific category or nature of a mission that an entity is associated with or engaged in.
  • C. rebuiltFor
    Indicates that one entity has been reconstructed, renovated, or modified specifically to serve the needs, purposes, or use of another entity.
  • D. missionPatch
    Indicates that an entity serves as the official emblem or insignia associated with a particular mission.
  • E. finalMissionOf
    Indicates that one entity is the last mission, assignment, or operation undertaken by another entity.
  • F. None of above.

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a88a174ab48190a5db20c132e5dccf completed March 4, 2026, 7:37 p.m.
NER Named-entity recognition batch_69abbf74147c81908793c3694894f94a completed March 7, 2026, 6:02 a.m.
NED1 Entity disambiguation (via context triple) batch_69ae58d5535c8190b59293afe3a10834 completed March 9, 2026, 5:21 a.m.
PD Predicate disambiguation batch_69abbd96a3b0819081efbfef975e1513 completed March 7, 2026, 5:54 a.m.
Created at: March 4, 2026, 7:44 p.m.