Triple

T2139315
Position Surface form Disambiguated ID Type / Status
Subject Space Telescope Imaging Spectrograph E46724 entity
Predicate installedByMission P15058 FINISHED
Object STS-82 E47795 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: STS-82 | Statement: [Space Telescope Imaging Spectrograph, installedByMission, STS-82]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: STS-82
Context triple: [Space Telescope Imaging Spectrograph, installedByMission, STS-82]
  • A. STS-82 chosen
    STS-82 was NASA’s second Space Shuttle servicing mission to upgrade and repair the Hubble Space Telescope, enhancing its scientific capabilities.
  • B. STS-88
    STS-88 was the first Space Shuttle mission to the International Space Station, delivering and assembling its initial U.S. and Russian modules in orbit.
  • C. STS-58
    STS-58 was a 1993 NASA Space Shuttle Columbia mission focused on life sciences research, particularly the effects of spaceflight on the human body.
  • D. STS-92
    STS-92 was a Space Shuttle Discovery mission in October 2000 that delivered and installed key structural components to help assemble the International Space Station.
  • E. STS-51-L
    STS-51-L was the ill-fated 1986 Space Shuttle Challenger mission that ended in disaster shortly after launch, resulting in the loss of all seven crew members.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: installedByMission
Context triple: [Space Telescope Imaging Spectrograph, installedByMission, STS-82]
  • A. installedBy chosen
    Indicates that one entity was set up, put in place, or made operational through the actions or intervention of another entity.
  • B. installedAt
    Indicates that something has been set up, placed, or put into operation at a specific location or site.
  • C. sentOnMissionBy
    Indicates that one entity was assigned or dispatched on a mission by another entity.
  • D. hasMissionAgency
    Indicates that an entity is associated with, overseen by, or carried out under the responsibility of a particular mission agency.
  • E. supportsMissionType
    Indicates that one entity is capable of handling, enabling, or being compatible with a specified type of mission.
  • F. None of above.

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a88a174ab48190a5db20c132e5dccf completed March 4, 2026, 7:37 p.m.
NER Named-entity recognition batch_69abbf74147c81908793c3694894f94a completed March 7, 2026, 6:02 a.m.
NED1 Entity disambiguation (via context triple) batch_69af1f72ad8c81909da734f6316f747f completed March 9, 2026, 7:28 p.m.
PD Predicate disambiguation batch_69abbd96a3b0819081efbfef975e1513 completed March 7, 2026, 5:54 a.m.
Created at: March 4, 2026, 7:44 p.m.