Triple

T2139267
Position Surface form Disambiguated ID Type / Status
Subject Wide Field Camera 3 E46723 entity
Predicate installedDuringMission P15058 FINISHED
Object Hubble Servicing Mission 4 E49339 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Hubble Servicing Mission 4 | Statement: [Wide Field Camera 3, installedDuringMission, Hubble Servicing Mission 4]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Hubble Servicing Mission 4
Context triple: [Wide Field Camera 3, installedDuringMission, Hubble Servicing Mission 4]
  • A. STS-115
    STS-115 was a 2006 NASA Space Shuttle Atlantis mission that resumed International Space Station construction by delivering and installing a major truss segment and associated hardware.
  • B. STS-109
    STS-109 was a NASA Space Shuttle Columbia mission in 2002 that upgraded and refurbished the Hubble Space Telescope, significantly enhancing its scientific capabilities.
  • C. STS-121
    STS-121 was a 2006 NASA Space Shuttle Discovery mission focused on testing new safety improvements and resupply of the International Space Station as part of the post-Columbia "Return to Flight" efforts.
  • D. STS-125 chosen
    STS-125 was NASA’s final Space Shuttle servicing mission to upgrade and repair the Hubble Space Telescope, extending its scientific capabilities and operational life.
  • E. Space Station Freedom program
    The Space Station Freedom program was a canceled NASA-led initiative from the 1980s–1990s to build a permanently crewed U.S. space station in low Earth orbit, whose plans and technologies were later folded into the International Space Station.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a88a174ab48190a5db20c132e5dccf completed March 4, 2026, 7:37 p.m.
NER Named-entity recognition batch_69abc5af20808190902031d8c0bba376 completed March 7, 2026, 6:29 a.m.
NED1 Entity disambiguation (via context triple) batch_69ae51b1290c8190a08850b428c99a6c completed March 9, 2026, 4:50 a.m.
Created at: March 4, 2026, 7:44 p.m.