Triple
T2139266
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Wide Field Camera 3 |
E46723
|
entity |
| Predicate | installedDuringMission |
P15058
|
FINISHED |
| Object | STS-125 |
E49339
|
NE FINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: STS-125 | Statement: [Wide Field Camera 3, installedDuringMission, STS-125]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: STS-125 Context triple: [Wide Field Camera 3, installedDuringMission, STS-125]
-
A.
STS-125
chosen
STS-125 was NASA’s final Space Shuttle servicing mission to upgrade and repair the Hubble Space Telescope, extending its scientific capabilities and operational life.
-
B.
STS-133
STS-133 was a 2011 NASA Space Shuttle mission that delivered supplies and the Permanent Multipurpose Module to the International Space Station as part of the final flights of the shuttle program.
-
C.
STS-134
STS-134 was the penultimate mission of NASA’s Space Shuttle program, a 2011 flight of Endeavour to the International Space Station that delivered the Alpha Magnetic Spectrometer and other critical hardware.
-
D.
STS-135
STS-135 was the final mission of NASA’s Space Shuttle program, flown by Atlantis in 2011 to resupply the International Space Station and conclude the shuttle era.
-
E.
STS-115
STS-115 was a 2006 NASA Space Shuttle Atlantis mission that resumed International Space Station construction by delivering and installing a major truss segment and associated hardware.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: installedDuringMission Context triple: [Wide Field Camera 3, installedDuringMission, STS-125]
-
A.
installedAt
Indicates that something has been set up, placed, or put into operation at a specific location or site.
-
B.
installedBy
chosen
Indicates that one entity was set up, put in place, or made operational through the actions or intervention of another entity.
-
C.
missionEquipment
Indicates that certain equipment is assigned to, used for, or associated with carrying out a specific mission.
-
D.
installationCompleted
Indicates that the process of installing something has finished successfully.
-
E.
constructedDuring
Indicates that one entity was built or created within the time period defined by another entity or event.
- F. None of above.
Provenance (4 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a88a174ab48190a5db20c132e5dccf |
completed | March 4, 2026, 7:37 p.m. |
| NER | Named-entity recognition | batch_69abbf74147c81908793c3694894f94a |
completed | March 7, 2026, 6:02 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69ae51b1290c8190a08850b428c99a6c |
completed | March 9, 2026, 4:50 a.m. |
| PD | Predicate disambiguation | batch_69abbd96a3b0819081efbfef975e1513 |
completed | March 7, 2026, 5:54 a.m. |
Created at: March 4, 2026, 7:44 p.m.