Triple
T21385989
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | North Fork Mokelumne River |
E527497
|
entity |
| Predicate | partOf |
P40
|
FINISHED |
| Object | Upper Mokelumne River Project |
—
|
NE NERFINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Upper Mokelumne River Project | Statement: [North Fork Mokelumne River, partOf, Upper Mokelumne River Project]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Upper Mokelumne River Project Context triple: [North Fork Mokelumne River, partOf, Upper Mokelumne River Project]
-
A.
Mokelumne River Project
The Mokelumne River Project is a hydroelectric and water supply system on California’s Mokelumne River that includes dams, reservoirs, powerhouses, and associated facilities supporting regional water and energy needs.
-
B.
Feather River Project
The Feather River Project is a major California water development and hydroelectric initiative centered on the Feather River watershed, providing water storage, power generation, and flood control for the state.
-
C.
Mokelumne River Project (PG&E hydroelectric system)
chosen
The Mokelumne River Project is a Pacific Gas and Electric Company hydroelectric system that harnesses the Mokelumne River through dams, reservoirs, and powerhouses to generate electricity and provide water storage in California.
-
D.
Truckee-Carson Project
The Truckee-Carson Project is a major U.S. federal water management and irrigation initiative in western Nevada that diverts and distributes water from the Truckee and Carson rivers to support agriculture and regional development.
-
E.
Shoshone Project
The Shoshone Project is a U.S. Bureau of Reclamation irrigation and water management development in Wyoming that harnesses the Shoshone River through dams, reservoirs, and canals to support agriculture and regional growth.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0b51f363c8190944000ab5523b02b |
completed | April 16, 2026, 10:08 a.m. |
| NER | Named-entity recognition | batch_69e8b0f3d37c8190b43ec77cdb1904c8 |
completed | April 22, 2026, 11:28 a.m. |
Created at: April 16, 2026, 5:12 p.m.