Triple

T21385989
Position Surface form Disambiguated ID Type / Status
Subject North Fork Mokelumne River E527497 entity
Predicate partOf P40 FINISHED
Object Upper Mokelumne River Project NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Upper Mokelumne River Project | Statement: [North Fork Mokelumne River, partOf, Upper Mokelumne River Project]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Upper Mokelumne River Project
Context triple: [North Fork Mokelumne River, partOf, Upper Mokelumne River Project]
  • A. Mokelumne River Project
    The Mokelumne River Project is a hydroelectric and water supply system on California’s Mokelumne River that includes dams, reservoirs, powerhouses, and associated facilities supporting regional water and energy needs.
  • B. Feather River Project
    The Feather River Project is a major California water development and hydroelectric initiative centered on the Feather River watershed, providing water storage, power generation, and flood control for the state.
  • C. Mokelumne River Project (PG&E hydroelectric system) chosen
    The Mokelumne River Project is a Pacific Gas and Electric Company hydroelectric system that harnesses the Mokelumne River through dams, reservoirs, and powerhouses to generate electricity and provide water storage in California.
  • D. Truckee-Carson Project
    The Truckee-Carson Project is a major U.S. federal water management and irrigation initiative in western Nevada that diverts and distributes water from the Truckee and Carson rivers to support agriculture and regional development.
  • E. Shoshone Project
    The Shoshone Project is a U.S. Bureau of Reclamation irrigation and water management development in Wyoming that harnesses the Shoshone River through dams, reservoirs, and canals to support agriculture and regional growth.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b51f363c8190944000ab5523b02b completed April 16, 2026, 10:08 a.m.
NER Named-entity recognition batch_69e8b0f3d37c8190b43ec77cdb1904c8 completed April 22, 2026, 11:28 a.m.
Created at: April 16, 2026, 5:12 p.m.