Triple

T21385390
Position Surface form Disambiguated ID Type / Status
Subject Galena Creek Bridge E527480 entity
Predicate partOf P40 FINISHED
Object I-580/US 395 freeway between Reno and Carson City NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: I-580/US 395 freeway between Reno and Carson City | Statement: [Galena Creek Bridge, partOf, I-580/US 395 freeway between Reno and Carson City]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: I-580/US 395 freeway between Reno and Carson City
Context triple: [Galena Creek Bridge, partOf, I-580/US 395 freeway between Reno and Carson City]
  • A. Interstate 80 near Carlin, Nevada
    Interstate 80 near Carlin, Nevada is a segment of the major transcontinental freeway in northeastern Nevada that serves as a key junction and access point for regional routes and the nearby mining community.
  • B. U.S. Route 50 Alternate in Fernley
    U.S. Route 50 Alternate in Fernley is a segment of the U.S. Highway System in Nevada that serves as an alternate east–west route to U.S. Route 50 through the Fernley area.
  • C. Nevada State Route 582
    Nevada State Route 582 is a major arterial roadway in the Las Vegas Valley that largely follows the former alignment of U.S. Route 93/95, connecting downtown Las Vegas with Henderson.
  • D. Nevada State Route 88
    Nevada State Route 88 is a short state highway in western Nevada that connects the Carson Valley area to the California state line, serving as a scenic route toward the Sierra Nevada.
  • E. California State Route 395
    California State Route 395 is a major north–south highway running along the eastern side of California, traversing the Eastern Sierra region and connecting desert, mountain, and rural communities.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: I-580/US 395 freeway between Reno and Carson City
Target entity description: The I-580/US 395 freeway between Reno and Carson City is a major north–south highway corridor in western Nevada that connects the state capital to the Reno–Sparks metropolitan area through the eastern Sierra foothills.
  • A. Interstate 80 near Carlin, Nevada
    Interstate 80 near Carlin, Nevada is a segment of the major transcontinental freeway in northeastern Nevada that serves as a key junction and access point for regional routes and the nearby mining community.
  • B. U.S. Route 50 Alternate in Fernley
    U.S. Route 50 Alternate in Fernley is a segment of the U.S. Highway System in Nevada that serves as an alternate east–west route to U.S. Route 50 through the Fernley area.
  • C. Nevada State Route 582
    Nevada State Route 582 is a major arterial roadway in the Las Vegas Valley that largely follows the former alignment of U.S. Route 93/95, connecting downtown Las Vegas with Henderson.
  • D. Nevada State Route 88
    Nevada State Route 88 is a short state highway in western Nevada that connects the Carson Valley area to the California state line, serving as a scenic route toward the Sierra Nevada.
  • E. California State Route 395
    California State Route 395 is a major north–south highway running along the eastern side of California, traversing the Eastern Sierra region and connecting desert, mountain, and rural communities.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b51f363c8190944000ab5523b02b completed April 16, 2026, 10:08 a.m.
NER Named-entity recognition batch_69ee62c9494081909efa74e189454dc6 completed April 26, 2026, 7:08 p.m.
Created at: April 16, 2026, 5:12 p.m.