Triple

T21382892
Position Surface form Disambiguated ID Type / Status
Subject Interstate 184 E527407 entity
Predicate hasJunction P1018 FINISHED
Object U.S. Route 30 in Boise, Idaho NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: U.S. Route 30 in Boise, Idaho | Statement: [Interstate 184, hasJunction, U.S. Route 30 in Boise, Idaho]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: U.S. Route 30 in Boise, Idaho
Context triple: [Interstate 184, hasJunction, U.S. Route 30 in Boise, Idaho]
  • A. U.S. Route 20 in Boise
    U.S. Route 20 in Boise is a major east–west U.S. Highway segment that serves as a primary arterial route through the Boise, Idaho metropolitan area.
  • B. U.S. Route 30 in Oregon
    U.S. Route 30 in Oregon is a major east–west highway that follows much of the Columbia River corridor, connecting coastal and inland communities across the northern part of the state.
  • C. U.S. Route 26 in Boise
    U.S. Route 26 in Boise is a major east–west federal highway corridor that passes through the city, connecting it to other key routes and regions in Idaho and beyond.
  • D. U.S. Route 30 in Nebraska
    U.S. Route 30 in Nebraska is a major east–west highway crossing the state, largely paralleling the Platte River and the Union Pacific Railroad as part of the historic Lincoln Highway corridor.
  • E. U.S. Route 30 near Bucyrus, Ohio
    U.S. Route 30 near Bucyrus, Ohio is a major east–west highway segment in north-central Ohio that serves as a key regional transportation corridor bypassing the city of Bucyrus.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: U.S. Route 30 in Boise, Idaho
Target entity description: U.S. Route 30 in Boise, Idaho is a segment of the historic east–west U.S. Highway 30 that serves as a major arterial route through the Boise area, connecting local streets with regional and interstate traffic.
  • A. U.S. Route 20 in Boise
    U.S. Route 20 in Boise is a major east–west U.S. Highway segment that serves as a primary arterial route through the Boise, Idaho metropolitan area.
  • B. U.S. Route 30 in Oregon
    U.S. Route 30 in Oregon is a major east–west highway that follows much of the Columbia River corridor, connecting coastal and inland communities across the northern part of the state.
  • C. U.S. Route 26 in Boise
    U.S. Route 26 in Boise is a major east–west federal highway corridor that passes through the city, connecting it to other key routes and regions in Idaho and beyond.
  • D. U.S. Route 30 in Nebraska
    U.S. Route 30 in Nebraska is a major east–west highway crossing the state, largely paralleling the Platte River and the Union Pacific Railroad as part of the historic Lincoln Highway corridor.
  • E. U.S. Route 30 near Bucyrus, Ohio
    U.S. Route 30 near Bucyrus, Ohio is a major east–west highway segment in north-central Ohio that serves as a key regional transportation corridor bypassing the city of Bucyrus.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b51f363c8190944000ab5523b02b completed April 16, 2026, 10:08 a.m.
NER Named-entity recognition batch_69e8b0f05278819096c511035ffc9777 completed April 22, 2026, 11:28 a.m.
Created at: April 16, 2026, 5:12 p.m.