Triple

T21379369
Position Surface form Disambiguated ID Type / Status
Subject Georgia State Route 42 E527300 entity
Predicate isNumberedBetween P36590 FINISHED
Object Georgia State Route 43 NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Georgia State Route 43 | Statement: [Georgia State Route 42, isNumberedBetween, Georgia State Route 43]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Georgia State Route 43
Context triple: [Georgia State Route 42, isNumberedBetween, Georgia State Route 43]
  • A. Georgia State Route 341
    Georgia State Route 341 is a state highway in Georgia that serves as a regional connector route, including passage through Walker County in the northwestern part of the state.
  • B. Georgia State Route 34
    Georgia State Route 34 is an east–west state highway in west-central Georgia that connects several communities, including Newnan in Coweta County, serving as a key regional transportation corridor.
  • C. Georgia State Route 49
    Georgia State Route 49 is a state highway in Georgia that runs through central parts of the state, connecting several communities and facilitating regional travel.
  • D. Georgia State Route 47
    Georgia State Route 47 is a state highway in east-central Georgia that connects several rural communities and small towns, including Appling, as part of the regional road network.
  • E. Georgia State Route 41
    Georgia State Route 41 is a state highway in west-central Georgia that runs north–south through several rural communities, including the town of Warm Springs.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Georgia State Route 43
Target entity description: Georgia State Route 43 is a state highway in Georgia that serves as a regional connector route, linking local communities and facilitating intrastate travel.
  • A. Georgia State Route 341
    Georgia State Route 341 is a state highway in Georgia that serves as a regional connector route, including passage through Walker County in the northwestern part of the state.
  • B. Georgia State Route 34
    Georgia State Route 34 is an east–west state highway in west-central Georgia that connects several communities, including Newnan in Coweta County, serving as a key regional transportation corridor.
  • C. Georgia State Route 49
    Georgia State Route 49 is a state highway in Georgia that runs through central parts of the state, connecting several communities and facilitating regional travel.
  • D. Georgia State Route 47
    Georgia State Route 47 is a state highway in east-central Georgia that connects several rural communities and small towns, including Appling, as part of the regional road network.
  • E. Georgia State Route 41
    Georgia State Route 41 is a state highway in west-central Georgia that runs north–south through several rural communities, including the town of Warm Springs.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b51f363c8190944000ab5523b02b completed April 16, 2026, 10:08 a.m.
NER Named-entity recognition batch_69e8b0cc2b5c8190aa5f20f920523fe9 completed April 22, 2026, 11:28 a.m.
Created at: April 16, 2026, 5:11 p.m.