Triple
T21355858
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Maria Theresa of Austria-Este |
E526621
|
entity |
| Predicate | end time (Queen consort of Sardinia) |
P22338
|
FINISHED |
| Object | 1821 |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 1821 | Statement: [Maria Theresa of Austria-Este, end time (Queen consort of Sardinia), 1821]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: end time (Queen consort of Sardinia) Context triple: [Maria Theresa of Austria-Este, end time (Queen consort of Sardinia), 1821]
-
A.
endTimeAsQueenConsort
chosen
Indicates the date and time at which an individual’s tenure as queen consort comes to an end.
-
B.
reignAsQueenConsortOfNaplesEnd
Indicates the time or event at which an individual’s tenure as queen consort of Naples comes to an end.
-
C.
endTimeAsFirstLadyOfFrance
Indicates the date and time when an individual's tenure as First Lady of France comes to an end.
-
D.
reignAsQueenConsortOfFranceEnd
Indicates the time or event at which an individual’s tenure as queen consort of France comes to an end.
-
E.
endTimeAsDuchessOfCourland
Indicates the point in time at which an individual’s tenure or role as Duchess of Courland comes to an end.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0b51cd5cc81909ac1187971e8a8ad |
completed | April 16, 2026, 10:08 a.m. |
| NER | Named-entity recognition | batch_69e8af9cd4a48190aa6e72c019b60f8c |
completed | April 22, 2026, 11:23 a.m. |
| PD | Predicate disambiguation | batch_69e6162bbfc88190a3e75859941b2638 |
completed | April 20, 2026, 12:03 p.m. |
Created at: April 16, 2026, 5:06 p.m.