Triple

T21330881
Position Surface form Disambiguated ID Type / Status
Subject Krittika E525894 entity
Predicate instanceOf P0 FINISHED
Object Hindu lunar mansion C44689 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Hindu lunar mansion
Context triple: [Krittika, instanceOf, Hindu lunar mansion]
  • A. Hindu lunar fortnight
    A Hindu lunar fortnight is a half-month period in the Hindu calendar, consisting of approximately 15 lunar days (tithis) between either a new moon and full moon (shukla paksha) or a full moon and new moon (krishna paksha).
  • B. Navagraha
    Navagraha refers to the nine celestial influencers in Hindu astrology—Sun, Moon, Mars, Mercury, Jupiter, Venus, Saturn, Rahu, and Ketu—believed to affect human destiny and cosmic order.
  • C. Tithi
    Tithi is a conceptual class representing a lunar day in the traditional Indian calendar, defined by the angular distance between the Sun and Moon and used to determine auspicious timings and ritual observances.
  • D. Saptarishi
    Saptarishi is a conceptual class representing the seven primordial sages in Hindu tradition, embodying cosmic wisdom, spiritual authority, and the transmission of sacred knowledge across ages.
  • E. celestial object in Hindu mythology
    A celestial object in Hindu mythology is a divine or cosmic body—such as a star, planet, constellation, or luminous weapon—endowed with spiritual significance, mythic narratives, and influence over cosmic order and human destiny.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b51b90788190a4dd823d962626da completed April 16, 2026, 10:08 a.m.
Created at: April 16, 2026, 4:42 p.m.