Triple
T21318016
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Fuller Warren Bridge |
E525528
|
entity |
| Predicate | hasDesignLife |
P8105
|
FINISHED |
| Object | long-span highway bridge design |
—
|
LITERAL FINISHED |
Provenance (3 batches)
| Stage | Batch ID | Job type | Status |
|---|---|---|---|
| creating | batch_69e0b51ad810819098c12392c8e55f6c |
elicitation | completed |
| NER | batch_69e75dd1ce9c81908c373362254427bf |
ner | completed |
| PD | batch_69e61612ab748190a72b8703b938abcb |
pd | completed |
Created at: April 16, 2026, 4:36 p.m.